Metro Station, Modinagar
Architectural canopy structures and connecting walkways for Metro Station at Modinagar on the Rapid Rail Transit corridor.
Explore 500+ successfully delivered oxygen systems and steel infrastructure projects across 15+ countries and 5 major industries.
Architectural canopy structures and connecting walkways for Metro Station at Modinagar on the Rapid Rail Transit corridor.
Projects Delivered
PSA Plants Installed
Sq Ft Steel Erected
On-Time Delivery
PEB buildings, heavy fabrication, and complex structural steel solutions built to spec, on time.
Industrial Pre Engineered Building designed and erected for textile manufacturing operations in Rajasthan.
Large-span Industrial Pre Engineered Building for petrochemical storage and processing in Haryana.
Plug & Play Pre Fabricated Shed delivered with rapid assembly for construction yard operations in Patna.
Industrial Pre Engineered Building providing high-capacity warehousing and logistics space in Punjab.
Industrial Pre Engineered Building constructed for Reliance operations in Jamnagar, executed by Sun Builders.
Robust Industrial Pre Engineered Building for rice processing and milling facility in Rudrapur, Uttarakhand.
Industrial Pre Engineered Building for eco-friendly packaging manufacturing unit in Varanasi, Uttar Pradesh.
Architectural canopy structures and connecting walkways for Metro Station at Modinagar on the Rapid Rail Transit corridor.
Industrial Pre Engineered Building for Coca-Cola bottling and manufacturing operations in Bhubaneswar, Odisha.
Structural Pre Engineered Building built for chemical processing and storage operations in Dhule, Maharashtra.
High-capacity Industrial Pre Engineered Warehouse serving tri-city logistics and supply chain operations in Punjab.
Modern Industrial Pre Engineered Building for automobile dealership and service facility in Bhopal, Madhya Pradesh.
From hospitals to heavy industry — our engineering solutions power operations across every major sector.
140+ Projects
160+ Projects
90+ Projects
60+ Projects
50+ Projects
Pure-Ox delivered our 200 Nm³/hr PSA plant 3 weeks ahead of schedule. The SCADA integration was flawless and the commissioning team was on-site for every step. Truly best-in-class execution.
Certified quality management system ensuring consistent engineering excellence across every project we deliver.
Start Your Project
Get a comprehensive technical feasibility report and commercial quote from our engineering consultants today. We deliver on time, every time.